91视频.com-91视频/91自拍-91视频1区免费观看-91视频91-91视频91视频免费观看-91视频91自拍国产自拍高清

News
Home -> News -> Corporate News
Scaffolding erection specifications have?
Time:2015/7/3 10:28:39                  Click:2904

1, scaffolding load should not exceed 270kg / m2, experience, income qualified before use listed, use should always check with maintenance. Load over 270kg / m2, or in the form of special scaffolding should be designed.
2, steel column should be set metal base, on the basis of geological or soft mat board should be set up sweep shot.
3, scaffolding pole should be vertical, vertical deviation must not exceed the height of 1/200, pole spacing of not more than two meters.
4, both ends of the scaffolding, and every corner of the pillars should be set 6-7 with a knife strut brace height of 7 meters or more can not be set up pickets, every four meters vertical and horizontal intervals of 7 meters and the building must was firmly connected.
5, the outer scaffolding, ramps, platforms set 1.05 m fence. When laying bamboo or wood, two must banding firmly put into use is strictly prohibited without banding.
6, the channel and the escalator at heightening reinforcement scaffold bar should not hinder the passage.
7, pick scaffolding generally 1.2 m step away from the rail, and set to increase bracing, bracing and the vertical angle of not more than 30 °.
8, in order to prevent the slide fastener curved rack tube compression from the ferrule, each rod protruding ends intersecting greater than 10 cm.
9, when the scaffolding erection place if power lines or electrical equipment must comply with the safety distance regulations, take measures to stop transmission during erection and dismantling.
10, when the scaffolding acceptance, coping visual inspection of all components, and implement and supervise the use of the system acceptance.
11, before the erection of scaffolding, must stand pipe, fasteners, bamboo, wire checks serious bent tube rack, fasteners severe corrosion, cracks, rotting rafts must be scrapped, not be used.
12, prohibits direct take on the scaffolding on the floor against a wooden flute and calculated without loading up heavy moiety, or the scaffolding and the scaffolding planks secured to the building structure is not very strong (such as railings, pipes, etc.).
13, scaffold boards and scaffolding should be firmly connected to each other. Scaffold boards should be placed on the two ends of the crossbar, firmly fixed. Scaffold boards are not allowed between the span of joints.
14, scaffold boards and board for a paved ramp on the shelf rails. In the outer ramps on both sides of the corner ramp and scaffolding face should be located 1m high railing, and in its lower plus set 18cm high guard.
15, scaffold shall be equipped with a solid ladder to staff up and down and transporting material. When the lifting device with lifting weights, allowed the lifting devices and scaffolding structures are connected.
16, scaffold erection work had pitched scaffolding leaders respond conformity inspection and provide written proof behind the prospective use. Daily maintenance work leader should check the status of the use of scaffolding and scaffold boards, if the defect shall be renovated immediately.
17, non-readily with barrels, boxes, bricks and other building materials to build temporary substitute for the formal scaffolding planks.
18, the scaffolding is prohibited Luanla wires. You must install temporary lighting circuits, bamboo scaffolding should be added insulator, metal pipe scaffold should separate wooden cross arm.
19, installation of metal pipe scaffolding, prohibit the use of bending, flattening or have a tube cracks, successive portions of each tube to be intact, to prevent dumping or movement.
20, a metal pipe scaffolding pole, must be perpendicular to the stability on the pad, the pad to the ground before placement compaction, leveling. Pole should be put on pedestals, column holder is made of post base and welded tubes on the bottom plate.
21, the metal pipe scaffolding joints, application of special hinges overlap each other, that the hinge is suitable for right-angle, also applies to acute and obtuse (for bracing, etc.). The connection between the various components of the hinge bolts must be tightened.
22, scaffold boards must be fixed to a metal pipe scaffolding beams.
23, when the mobile scaffold, all staff must be down the scaffolding, scaffolding work was above prohibition movement.

Up:Construction of the arch stand aside should consider several factors
Next:Our company won the Outstanding Contribution Award for 2022

News

二維碼

Sweep More wonderful

主站蜘蛛池模板: 国产成人精品一区二 | 欧美一级大片在线观看 | av免费不 | 亚洲爆乳无码专区www | 色婷婷精品视频在线观看 | 亚洲精品日本高清中文字幕 | 日本成人黄色大 | 2025国精品夜夜天天拍 | 国产精品一区一级毛片 | 国产av无码区亚洲77777 | 日本高清不卡中文字幕视频 | a视频在线 | 一区二区三区四区精品视频 | 亚洲av日韩av综合在线观看 | 狠狠综合久久亚洲电影 | 亚洲国产亚洲综合在线尤物 | 国产成人片在线观看 | 亚洲一区二区在线播放 | 欧美午夜视频一区 | 宅男午夜大片啪啪软件 | 日韩福利午夜无码免费 | 国产午夜精品视频 | 国产成人久久综合777777麻豆 | av在线免费观看播放 | 国产精品无码一区二区三区 | 中文字幕有码高清 | 国产一区激情在线播放 | 色偷偷av男人的天堂京东热 | 午夜电影院 | 91久久久久就去 | 国产精品白浆在线观看无码专区 | 精品少妇一区二区三区免费观 | 亚洲一区二区三区无码高清 | 亚洲男人的天堂av无码网站 | 国产美女精品自在线拍免费 | 中文字幕久久中文字幕久久 | 日韩欧美高清在线 | 国产精品欧美久久久久天天影视 | 国产精品秘一区二区三区 | 日韩精品国 | 无码国产精品一区二区免费模 |